triadaprinter.blogg.se

Hyper volt
Hyper volt










  1. #HYPER VOLT INSTALL#
  2. #HYPER VOLT FREE#

  • An appropriate adult must be present on the day of the installation to enable commissioning, access to the property and demonstration of the charge point.
  • If on your day of installation Incorrect or False claims of OZEV eligibility are discovered it will incur a cost of £100 and works will cease or be cancelled.
  • #HYPER VOLT FREE#

    Any additional required work can be discussed on site and a free estimate supplied valid for 90 days.

    #HYPER VOLT INSTALL#

    We will fully install and commission your single phase charger upto 7.4Kw to include the running of a cable fixed on the outside of your property upto 15 metres at a maximum height of 2.8 metres, the fitting of a separate consumer unit within your property or external meter box (unless existing consumer unit allows for direct connection), the fitting and connection of your charge point to a wall and accessories where applicable,the fitting of an functional isolation switch, the fitting of a surge suppressor where risk assessment calculations deems it advisable to protect the system from transient over voltage of atmospheric origins,connection and set up of current transformer clamp to monitor Installation loading, electrical installation test and inspection of the work carried out, commissioning and demonstration of the charge point,claim of the grant on your behalf, electronic copies of test certification and building control notice, notification to your distribution network operator.Please note where required main equipotential earth bonding must be fitted, the electricity supply & meter must meet minimum required standards, any extraneous metalwork within touching distance of your EV parking space must be insulated or terminated to the same earthing system as the charge point, steady WiFi signal is required at the charge point location to -68dBm or superior, please ensure charge point has curtailment option or you have purchased management device where needed *90% of installs will require load management. Test and inspection of the installation.Connection and commissioning via local WiFi network.Fitting of cable holders/cradles if applicable.Fitting of current limiting clamp and wiring upto 15 metres between charge point and meter, additional accessories to charge point required in some cases.Fitting of Surge protection where required.Connection at your consumer unit or meter position.

    hyper volt hyper volt

    Up to 15 metres of cabling run externally.( Including Electric Vehicle Homecharge Scheme Government Contribution )












    Hyper volt